The basement was framed in last week and the sheeting put on for the upstairs floor. You can see that the lumber has been delivered to begin the exterior wall framing early next week. In the background, the well pump is being installed. You can also see on the right that more dirt has been moved to meet the county's cut-back slope requirements for our driveway. Things are moving along well!
Saturday, September 15, 2007
Basement Framed In
The basement was framed in last week and the sheeting put on for the upstairs floor. You can see that the lumber has been delivered to begin the exterior wall framing early next week. In the background, the well pump is being installed. You can also see on the right that more dirt has been moved to meet the county's cut-back slope requirements for our driveway. Things are moving along well!